Zhejiang Yongan Construction Machinery Co., Ltd.
  • 
  • Home
  • Products +
    • Solutions
    • Markets +
      • Applications
        1. Offshore Wind Farm
        2. Sea Bridge
        3. Cofferdam
        4. Harbour
        5. Oil Platform
        6. Civil Infrastructure
        7. Solar Power Plant
      • Pile Types
        1. Sheet Piles
        2. H-Piles
        3. Steel Tubular Piles
        4. Timber Piles
        5. Precast Concrete Piles
        6. Bored Piles (Caisson Piles)
    • Case Studies
    • Why Us +
      • Capabilities
      • R&D
      • Our Facilities
    • About Us +
      • Company Profile
      • History
      • Certification
      • Service
    • Videos
    • Contact
    Pile Driving Equipment Solution for
    Offshore Wind Farm Construction
    • Home
    • Markets
    • Offshore Wind Farm
    Offshore Wind Farm

    On land, foundation piles mainly experience axial forces, while in offshore wind projects, monopiles face both axial and radial loads. Vibration piling can slightly reduce radial load capacity. So, a common solution is driving the pile to the final designed depth with a hammer.

    Challenge

    Noise issue: excessive noise in marine environments potentially impacts the surrounding ecosystem, especially marine life.

    Our Solution

    Our vibratory hammers offer high piling efficiency with minimal environmental impact and can correct alignment at any time. They are ideal for projects requiring high precision, particularly in offshore wind farm construction.

    Offshore Wind Farm
    • Jacket
    • Monopile
    • Gravity base
    • Tripod
    • Multi-pile
    Recommended Products
    Hydraulic Vibratory Hammer

    Hydraulic Vibratory Hammer (Large Size)

    Hydraulic Impact Hammer

    Hydraulic Impact Hammer (Large Size)

    Hydraulic Impact Hammer

    Hydraulic Impact Hammer (Ultra-large Size)

    External Lifting Tool

    External Lifting Tool

    Internal Lifting Tool

    Internal Lifting Tool

    Related Case Studies
    Changle Offshore Wind Farm Construction in Fujian
    Changle Offshore Wind Farm Construction in Fujian
    • Thickness: 55 mm
    • Weight: 300-420 t
    • Application: offshore wind farm
    • Model: hydraulic impact hammer YC-180 and pile upending tool FZQ-600
    Project Gallery
    Changle Offshore Wind Farm Construction in Fujian
    Changle Offshore Wind Farm Construction in Fujian
    Hydraulic Impact Hammer YC-180
    Hydraulic Impact Hammer
    Model YC-180
    Impact Energy 3060 kNm
    Working Stroke 1700 mm
    Impact Frequency 55/20 bpm
    Ram Weight 180000 kg
    Dimensions (L×W×H) 14400×2765×2765 mm
    Weight (without pile cap) 287000 kg
    Pile Upending Tool FZQ-600
    Pile Upending Tool
    Model FZQ-600
    Maximum Lifting Load 600 ton
    Maximum Clamping Force 14400 kN
    Maximum Working Pressure 280 bar
    Clamp Scope 2.5-4 m
    Dimensions (L×W×H) 4500×4000×2600 mm
    Weight 27000 kg
    Offshore Wind Power Project in Qingzhou, Yangjiang
    Offshore Wind Power Project in Qingzhou, Yangjiang
    • Diameter: 3.3 m
    • Thickness: 55 mm
    • Weight: 300-400 t
    • Model: pile upending tool FZQ-600
    Project Gallery
    Offshore Wind Power Project in Qingzhou, Yangjiang
    Offshore Wind Power Project in Qingzhou, Yangjiang
    Pile Upending Tool FZQ-600
    Pile Upending Tool
    Model FZQ-600
    Maximum Lifting Load 600 ton
    Maximum Clamping Force 14400 kN
    Maximum Working Pressure 280 bar
    Clamp Scope 2.5-4 m
    Dimensions (L×W×H) 4500×4000×2600 mm
    Weight 27000 kg
    Offshore Wind Farm Construction in Yangjiang, Guangdong
    Offshore Wind Farm Construction in Yangjiang, Guangdong
    • Diameter: 2.8 m
    • Thickness: 50 mm
    • Pile length: 87.5 m
    • Weight: 260-300 t
    • Application: offshore wind farm
    • Model: pile upending tool FZQ-600i and FZQ-600
    Project Gallery
    Offshore Wind Farm Construction in Yangjiang, Guangdong
    Offshore Wind Farm Construction in Yangjiang, Guangdong
    Pile Upending Tool FZQ-600
    Pile Upending Tool
    Model FZQ-600
    Maximum Lifting Load 600 ton
    Maximum Clamping Force 14400 kN
    Maximum Working Pressure 280 bar
    Clamp Scope 2.5-4 m
    Dimensions (L×W×H) 4500×4000×2600 mm
    Weight 27000 kg
    Pile Upending Tool FZQ-600i
    Pile Upending Tool
    Model FZQ-600i
    Maximum Lifting Load 600 ton
    Maximum Clamping Force 12000 kN
    Maximum Working Pressure 250 bar
    Clamp Scope 2.8-3.3 m
    Dimensions (L×W×H) 5000×2650×3580 mm
    Weight 26800 kg
    Mingyang Electric’s Section I of Project 4 in Qingzhou, Yangjiang
    Mingyang Electric’s Section I of Project 4 in Qingzhou, Yangjiang
    • Site: deep water
    • Model: pile upending tool FZQ-6001
    Project Gallery
    Mingyang Electric’s Section I of Project 4 in Qingzhou, Yangjiang
    Pile Upending Tool FZQ-600i
    Pile Upending Tool
    Model FZQ-600i
    Maximum Lifting Load 600 ton
    Maximum Clamping Force 12000 kN
    Maximum Working Pressure 250 bar
    Clamp Scope 2.8-3.3 m
    Dimensions (L×W×H) 5000×2650×3580 mm
    Weight 26800 kg
    Get in Touch

    40 Years of Experience

    Hydraulic Vibratory Hammer
      1. Sea Bridge
      2. Pile Driving Equipment Solution for Sea Bridge Construction
      1. Cofferdam Construction
      2. Pile Driving Equipment Solution for Cofferdam Construction
      1. Harbour Construction
      2. Pile Driving Equipment Solution for Harbour Construction
      1. Oil Platform Construction
      2. Pile Driving Equipment Solution for Oil Platform Construction
    Pile Types
    Sheet Piling Solution

    Sheet Piling Solution

    Pile Driving Equipment for Sheet Piles
    Steel H-Piling Solution

    Steel H-Piling Solution

    Pile Driving Equipment for H-Piles
    Steel Tubular Piling Solution

    Steel Tubular Piling Solution

    Pile Driving Equipment for Steel Tubular Piles
    Timber Piling Solution

    Timber Piling Solution

    Pile Driving Equipment for Timber Piles
    Precast Concrete  Piling Solution

    Precast Concrete Piling Solution

    Pile Driving Equipment for Precast Concrete Piles
    Bored Piling Solution

    Bored Piling Solution

    Pile Driving Equipment for Bored Piles (Caisson Piles)
    Piling Machinery Manufacturer

    Yongan Machinery, founded in 1985, has nearly 40 years of experience in the manufacturing and R&D of piling products, especially hydraulic vibro hammers, hydraulic impact hammers, electric vibro hammers, and pile upending tools. Our products are widely used in harbour, bridge, underwater, offshore wind farm, and house building construction projects. For example, the Hangzhou Bay Bridge, Hong Kong-Zhuhai-Macau Bridge, Xiamen Jimei Bridge, Nanjing Dashengguan Yangtze River Bridge, and the Shenzhen-Zhongshan Bridge construction.

    • Since 1985
    • Countries over 80
    • Patents 400
    Products
    • Hydraulic Vibro Hammer
    • Hydraulic Impact Hammer
    • Electric Vibro Hammer
    • Pile Upending Tool
    • Hydraulic Power Pack
    Applications
    • Offshore Wind Farm
    • Sea Bridge
    • Cofferdam
    • Harbour
    • Oil Platform
    • Civil Infrastructure
    • Solar Power Plant
    Navigation
    • About Us
    • Why Us
    • Case Studies
    • Solutions
    • Videos
    Contact Us

    Zhejiang Yongan Construction Machinery Co., Ltd.

    Lance Xu / Lily Xia
    yonganmachine@outlook.com
    +86-13967738729
    +86-19817528617