- Lifting Load: 100-1200 ton
- Max. Clamping Force: 2400-32000 kN
- Clamp Scope: 1-12 m
Introducing our pile upending tools, specifically developed for upending large-diameter steel tubular piles. Designed for offshore wind projects, these tools navigate time-consuming pile upending and the complexity of sea conditions. Based on our hydraulic vibro hammer clamp system, we have innovated these highly sought-after tools for offshore wind applications. Our range includes over 10 models, from FZQ-100 to FZQ-1200, suitable for different pile sizes (diameter: 1-12 m, weight: 100-1200 t).
External Lifting Tool
Introducing our external lifting tools (FZQ series), high-efficiency engineering equipment designed for pile handling. Equipped with clamps that securely grip the walls of tubular piles, these tools can lift piles once the control panel indicates a tight grip. With their maximum lifting loads ranging from 100 t to 1200 t, these hydraulic-powered tools ensure precise and stable operation, enhancing safety during the upending process. Customization is available to meet your specific needs.
- Civil Infrastructure Construction
- Offshore Wind Farm Construction
Internal Lifting Tool
Introducing our internal lifting tools (FZQ-600i series), high-efficiency engineering equipment designed specifically for pile handling. Featuring an internal expansion design, these tools efficiently grip and upend various sizes of tubular piles. With a vertical lifting load of 600 t and a horizontal capacity of 1200 t, along with 120 t of maxi. Listing capacity at auxiliary lift point, these hydraulic-powered tools ensure precise, stable, and safe operation. Customization is available to meet your specific needs.
- Widely used in building
- Bridge, and foundation engineering projects
- Providing flexible
- Reliable pile handling solutions






